Home | Metals Solutions | Production Scheduling Solutions | Caster Scheduler |
|
|
Broner Caster Scheduler
A dedicated scheduling tool designed to meet the unique and complex scheduling needs of the casting plant.
Benefits
- Lower costs, due to reduced pig iron dumping, longer heat and tundish sequences and increased hot charging
- Reduced stock due to 'upgrade' functionality
- Increased productivity through longer heat and tundish sequences and reduced quality diverts
- Better customer service as the Caster Scheduler is integrated with the Broner Production Planning system.
Features
- Generates schedules for multi-strand casters
- Exploits grade families and hot mill spread and squeeze rules to optimize heat sequence and minimize stock
- Supports hot charging
- Considers all physical, metallurgical and quality rules
- Has a real-time slab allocation facility for assigning off-specification material to alternative orders.

Caster Scheduler Output
|
|